Installation of the first Infiltrator EcoPod Edge600 in North America!
The Infiltrator EcoPod Edge600 is a residential advanced wastewater treatment unit manufactured by Infiltrator Water Technologies. These units are an innovative approach to onsite wastewater disposal where nitrogen reduction is required.
The Save Our Indian River Lagoon (SOIRL) Project Plan funds these septic upgrades where a connection to central sewer is not feasible. Eligible homeowners can receive up to $20,000. The amount is based on how much nitrogen the property’s drainfield is estimated to send toward groundwater.
Green Septic can help you check grant eligibility, file the SOIRL application, pull the permit, and install the system. We are a listed SOIRL septic-upgrade contractor and accept payment directly from Brevard County Natural Resources, so you do not have to pay the grant portion up front and wait on reimbursement.
Step 1 – Pumping out the existing septic tanks and prepping the new Edge 600 for installation
Step 2 – Ripping out the old conventional septic tanks
Top down perspective of the Edge 600
Close up of the Edge 600 Aerobic Treatment Unit
Step 3 – Ryan is digging the hole to set the Edge 600 into
Step 4 – Lifting the Edge 600 into its new home
Step 6 – Gently filling in around the Edge 600 with sand
Step 5 – Edge 600 is confirmed with laser level to be sitting flat and has correct amount of gravity flow from the house to the tank
Step 9 – Inspector approved the system for cover, chambers have been overlaid with a filter fabric and Ryan is beginning to cover the drain field with sand
Step 7 – Edge 600 risers have been installed to what will be the soil grade height, tank has been completely covered and now the drain field is being prepped for chamber installation
Step 8 – Infiltrator Qucik4 Plus Low Profile Chambers have been installed and are ready for inspection
Step 10 – Work area has been graded to conform with the slope and raked in preparation of the homeowner putting down sod or grass seed